Hydromechanics in water engineering; terms
€91.03
Dam plants - Part 13: Weirs.
€84.58
Water and geothermal drilling - Vertical geothermal probe - Part 1 : general - Forage d'eau et de géothermie
€82.00
Geothermal energy drilling - Grouting for closed vertical geothermal exchanger (geothermal probe)
€107.33
Dam plants -Directions for projection, construction and operation - Part 2: Weirs
€34.30
Dam plants - Directions for projection, construction and operation - Part 1: barrages
Dam plants - Part 13: Weirs
€56.17
Dam plants - Part 10: General specifications
€77.20
Dam plants - Part 11: Dams.
€105.42
Dam plants - Part 12: Flood retarding basins.
Dam plants - Part 14: Pumped-storage reservoirs.
€41.78
Dam plants - Part 15: Setting ponds.
€48.79
Concrete revetments in hydraulic engineering - Part 2: Requirements for non-interlocking revetments
€111.40
Concrete revetments in hydraulic engineering - Part 200: Evaluation of conformity of non-interlocking revetment blocks in addition to DIN 1186-2
Water quality - Assessment of damage to fish passing through pumping stations and hydropower plants - Methods based on live fish passage survival test and blade strike model; German version EN 18110:2025
€179.53