ELECTRICAL INSTALLATIONS IN SHIPS. PART 302: EQUIPMENT. SWITCHGEAR AND CONTROLGEAR ASSEMBLIES.
€48.00
Standard Practice for Piping System Drawing Symbols (Withdrawn 2004)
This product is not for sale, please contact us for more information
Standard Practice for Human Engineering Design for Marine Systems, Equipment and Facilities
Sewage systems on ships - Flanges for international discharge connections
€34.30
Terminal connectors with clamping-screw, 16 A, 500 V, for nominal cross-sectional areas up to 2,5 mm
Inland navigation vessels - Boarding ladders; German version prEN 1502:1994
€41.78
Handrails on superstructures and deckhouses on seagoing vessels
Decca Navigator system:Receivers for ships. Minimum performance standards. Methods of testing and required test results
€193.00
Shipbuilding - Marine facsimile receivers for meteorological charts (ISO 9876:1989)
€50.00
Amendment 1 - Electrical installations in ships. Part 350: Low-voltage shipboard power cables - General construction and test requirements
€11.00
Global maritime distress and safety system (GMDSS) - Part 2: COSPAS-SARSAT EPIRB - Satellite emergency position indicating radio beacon operating on 406 MHz - Operational and performance requirements, methods of testing and required test results
€286.00
Equipment Engineering (EE) - Environmental conditions and environmental tests for telecommunications equipment - Part 2-6: Specification of environmental tests, ship environments; English version ETS 300019-2-6:1994
€56.17
General arrangement plans for ships - Contents, types, concepts
€63.27
General arrangement plans for ships - Example bulkcarrier