Railway applications - Track - Acceptance of works - Part 2: Works on ballasted track - Switches and crossings
€50.00
Railway applications - Track - Acceptance of works - Part 1: Works on ballasted track - Plain line
Railway applications - Track - Rail - Part 2: Switch and crossing rails used in conjunction with Vignole railway rails 46 kg/m and above
Railway applications - Track - Switches and crossings - Part 3: Requirements for wheel/rail interaction
Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design
Railway applications - Track - Rail - Part 1: Vignole railway rails 46 kg/m and above
Railway applications - Wheel/rail friction management - Part 2-2: Properties and characteristics - Top of rail materials
€163.00
Railway applications - Wheel/rail friction management - Part 1-2: Equipment and application - Top of rail
€142.00
Railway infrastructure — Rail fastening systems — Two directional test method for resistance to repeated loading
€183.00
Railway infrastructure - Rail fastening systems - Part 8: Test method for vertical stiffness (ISO 22074-8:2022); German version EN ISO 22074-8:2024
€84.58
Railway infrastructure - Rail fastening systems - Part 2: Test method for longitudinal rail restraint (ISO 22074-2:2021)
€60.00
Railway infrastructure - Rail fastening systems - Part 1: Vocabulary (ISO 22074-1:2020)
€54.00
Railway infrastructure - Rail fastening systems - Part 5: Test method for electrical resistance (ISO 22074-5:2021)
Railway infrastructure - Rail fastening systems - Part 3: Proof load test method for pull-out resistance (ISO 22074-3:2021)
Railway infrastructure - Rail fastening systems - Part 4: Test methods for resistance to repeated loading (ISO 22074-4:2022)
€69.00