Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems
€71.00
IEEE Guide for Aeolian Vibration Field Measurements of Overhead Conductors
€85.00
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 5 : resistance to earth - Sécurité électrique dans les réseaux de distribution basse tension de 1 000 V c.a. et 1 500 V c.c.
€59.33
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 1 : general requirements - Sécurité électrique dans les réseaux de distribution basse tension de 1 000 V c.a. et 1 500 V c.c.
€95.67
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 2 : insulation resistance - Sécurité électrique dans les réseaux de distribution basse tension de 1 000 V c.a. et 1 500 V c.c.
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 3 : loop impedance - Sécurité électrique dans les réseaux de distribution basse tension de 1 000 V c.a. et 1 500 V c.c.
€77.67
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 7 : phase sequence - Sécurité électrique dans les réseaux de distribution basse tension de 1 000 V c.a. et 1 500 V c.c.
Operation of electrical installations
€316.00
Low-voltage surge protective devices Surge connected to low-voltage power systems. Requirements and tests
€404.00
General guidelines for the design of ground electrodes for high-voltage direct current (HVDC) links
€325.00
Electrical safety in low voltage distribution systems up to 1000 V a.c. and 1500 d.c. Equipment for testing, measuring or monitoring of protective measures Phase sequence
€165.00
Corrigendum 1 - Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 8: Insulation monitoring devices for IT systems
€0.00
IEEE Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power Substations
€107.00
Parafoudres basse-tension - Partie 11 : parafoudres connectés aux systèmes de distribution basse tension - Prescriptions et essais
€111.67
Appareillage à haute tension - Partie 202 : postes préfabriqués haute tension/basse tension
€184.00