Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler
€50.00
Water-tube boilers and auxilliary installations - Part 3: Design and calculation for pressure parts
Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories
Water-tube boilers and auxiliary installations - Part 1: General
Mechanical vibration of non-reciprocating machines. Measurements on rotating shafts and evaluation criteria Land-based steam turbines generators in excess 50 MW with normal operating speeds 1500 r/min, 1800 3000 r/min 3600
€193.00
Mechanical vibration. Evaluation of machine vibration by measurements on non-rotating parts Land-based steam turbines and generators in excess 50 MW with normal operating speeds 1500 r/min, 1800 3000 r/min 3600
Gas turbines — Procurement Part 5: Applications for petroleum and natural gas industries
This product is not for sale, please contact us for more information
Rules for steam turbine thermal acceptance tests - Part 3: Thermal performance verification tests of retrofitted steam turbines
€418.00
Specification for design and manufacture of water-tube steam generating plant (including superheaters, reheaters and steel tube economizers)
€434.00
Steam generator control - Furnace pressure control
€71.85
Gas turbines - Procurement - Part 9 : reliability, availability, maintainability and safety - Turbines à gaz
€108.33
WATER TUBE BOILERS - PART 4: IN-SERVICE BOILER LIFE EXPECTANCY CALCULATIONS
€70.00
Water-tube boilers and auxiliary installations - Part 14: Requirements for fluegas DENOX-Systems; German version prEN 12952-14
€98.32
Water-tube boilers and auxiliary installations In-service boiler life expectancy calculations
Water-tube boilers and auxiliary installations - Part 4: In-service boiler life expectancy calculations