GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT. PART 5-1: STEAM TURBINES.
€88.00
GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT. PART 5-2: GAS TURBINES.
€76.00
GUIDE FOR PROCUREMENT OF POWER STATION OF POWER STATION EQUIPMENT. PART 6-1: TURBINE AUXILIARIES. DEAERATORS.
€75.00
GUIDE FOR PROCUREMENT OF POWER STATION OF POWER STATION EQUIPMENT. PART 6-2: TURBINE AUXILIARIES. FEEDWATER HEATERS.
GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT. PART 6-3: TURBINES AUXILIARIES. CONDENSER PLANT.
€77.00
GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT. PART 6-7: TURBINE AUXILIARIES. MOISTURE SEPARATOR REHEATERS.
PETROLEUM PRODUCTS AND LUBRICANTS. PETROLEUM LUBRICATING OILS FOR TURBINES.(CATEGORIES ISO-L-TSA AND ISO-L-TGA). SPECIFICATIONS.
€35.00
Water-tube boilers and auxiliary installations - Part 11: Requirements for limiting devices of the boiler and accessories
€86.00
MAINTENANCE AND USE GUIDE FOR PETROLEUM LUBRICATING OILS FOR STEAM TURBINES.
€69.00
Mechanical vibration - Measurement and evaluation of machine vibration - Part 2: Land-based gas turbines, steam turbines and generators in excess of 40 MW, with fluid-film bearings and rated speeds of 1500 r/min, 1800 r/min, 3000 r/min and 3600 r/min - Amendment 1 (ISO 20816-2:2017/DAM 1:2023); Text in German and English
€34.30
Testing of lubricants and related products - Determination of the temperature stability of turbine oils
€84.58
Water-tube boilers and auxiliary installations - Part 1: General; German and English version prEN 12952-1:2024
€77.20
Guide for procurement of power station equipment - Part 6-4: Turbine auxiliaries; pumps; German version EN 45510-6-4:1999
€98.32
Guide for procurement of power station equipment - Part 6-5: Turbine auxiliaries; dry cooling systems; German version EN 45510-6-5:1999
Guide for procurement of power station equipment - Part 6-6: Turbine auxiliaries; wet and wet/dry cooling towers; German version EN 45510-6-6:1999