Gas infrastructure - Safety Management System (SMS) and Pipeline Integrity Management System (PIMS) - Functional requirements
€163.00
Metallic industrial piping - Part 7: Guidance on the use of conformity assessment procedures; German version CEN/TR 13480-7:2022
€72.80
Outer flanges and welding necks for pipes of steel - Part 3: Slip on flanges DN 20 to DN 300; Text in German and English
€69.91
Raccords pour flexibles avec demi-coquille - Partie 4 : raccordements à bride
€65.66
Equipements pour gaz de pétrole liquéfié et leurs accessoires - Canalisations composites pour GPL en phase liquide et phase vapeur - Conception et fabrication
€82.01
Austenitic, austenitic-ferritic and ferritic longitudinally welded stainless steel tubes for the food and chemical industry
Infrastructures gazières - Système de management de la sécurité (SMS) et système de management de l’intégrité des canalisations (PIMS) - Exigences fonctionnelles
€117.24
Polyolefin pipes for the conveyance of fluids — Determination of resistance to crack propagation — Test method for slow crack growth on notched pipes
€269.00
Plastics. Rehabilitation of supply and sewerage pipes with continuous cured tubes in situ (CIPP). Design, calculation and installation
€101.00
District heating pipes. Factory made flexible pipe systems Bonded system with plastic service pipes; requirements and test methods
€193.00
BS EN 17878-1. District heating pipes. Factory made flexible pipe systems with a lower temperature profile Classification, general requirements and test methods
€23.00
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 2: Pipes - Amendement 2: Impact test (ISO 15874-2:2013/Amd 2:2022)
€20.00
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 1: General - Amendment 1: Impact test (ISO 15874-1:2013/Amd 1:2022)
Standard Symbols for Dimensions of Plastic Pipe Fittings
€65.00
Standard Specification for Machine Made “Fiberglass” (Glass-Fiber-Reinforced Thermosetting Resin) Flanges