LPG Equipment and accessories - Pressure relief valves for LPG pressure vessels
€81.00
Multilayer piping systems for hot and cold water installations inside buildings - Part 7: Guidance for the assessment of conformity - Amendment 1 (ISO/TS 21003-7:2008/Amd 1:2010)
€32.00
Multilayer piping systems for hot and cold water installations inside buildings - Part 7: Guidance for the assessment of conformity (ISO/TS 21003-7:2008)
€70.00
Austenitic, austenitic-ferritic and ferritic longitudinally welded stainless steel tubes for the food and chemical industry
€59.00
Clamp type coupling assemblies for use with steam hoses rated for pressures up to 18 bar
€76.00
Non-destructive testing - Radiographic inspection of corrosion and deposits in pipes by X- and gamma rays - Part 1: Tangential radiographic inspection
€85.00
Non-destructive testing - Radiographic inspection of corrosion and deposits in pipes by X- and gamma rays - Part 2: Double wall radiographic inspection
€86.00
Standard Test Methods for Holiday Detection in Pipeline Coatings
This product is not for sale, please contact us for more information
Thermoplastic multi-layer (non-vulcanized) hoses and hose assemblies for the transfer of hydrocarbons, solvents and chemicals - Specification; German version EN 13765:2010/FprA1:2014
€34.30
Standard Specification for Welded Stainless Steel Mechanical Tubing
Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure - Unplasticized poly(vinyl chloride) (PVC-U) - Part 1: Specifications for pipes, fittings and the system; German version EN 1329-1:2014
€116.64
Gas infrastructure - Pipelines for maximium operating pressure up to and including 16 bar - Part 5: Service lines - Specific functional requirements; German version EN 12007-5:2014
€91.03
Flanges and their joints - Gasket parameters and test procedures relevant to the design rules for gasketed circular flange connections; German version EN 13555:2014
€111.40
Tuyaux, tubes et flexibles en caoutchouc et en plastique pour utilisation avec le propane, le butane et leurs mélanges en phase vapeur - Partie 1 : tuyaux et tubes
€82.01
Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping
€50.00