Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 1: General functional requirements
€80.00
Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 2: Specific functional requirements for polyethylene (MOP up to and including 10 bar)
€78.00
Flexible hoses for connection of gas receiving installations to gas-fired appliances. Metal hose assemblies with safety gas connection valves and thread. Part 2: Stainless steel flexible hose assemblies.
€20.00
Vitrified clay pipe systems for drains and sewers - Part 7: Requirements for pipes and joints for pipe jacking
€121.00
Vitrified clay pipes systems for drain and sewers - Part 6: Requirements for components of manholes and inspection chambers
Vitrified clay pipe systems for drains and sewers - Part 5: Requirements for perforated pipes and fittings
€89.00
Vitrified clay pipe systems for drains and sewers - Part 4: Requirements for adaptors, connectors and flexible couplings
€142.00
Vitrified clay pipe systems for drains and sewers - Part 2: Evaluation of conformity and sampling
€163.00
Vitrified clay pipe systems for drains and sewers - Part 1: Requirements for pipes, fittings and joints
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 3: Fittings (ISO 15874-3:2013)
€92.00
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 1: General (ISO 15874-1:2013)
€58.00
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 2: Pipes (ISO 15874-2:2013)
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 5: Fitness for purpose of the system (ISO 15874-5:2013)
Fire-fighting hoses - Test methods
€100.00
Vitrified clay pipes systems for drain and sewers - Part 6 : requirements for components of manholes and inspection chambers
€82.01