Plastics piping systems for hot and cold water installations - Crosslinked polyethylene (PE-X) - Part 5: Fitness for purpose of the system - Amendment 1 (ISO 15875-5:2003/Amd 1:2020)
€51.00
Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 3: Fittings - Amendment 1 (ISO 15876-3:2017/Amd 1:2020)
€36.00
Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 5: Fitness for purpose of the system - Amendment 1 (ISO 15876-5:2017/Amd 1:2020)
€41.00
Plastics piping systems for hot and cold water installations - Crosslinked polyethylene (PE-X) - Part 3: Fittings - Amendment 1 (ISO 15875-3:2003/Amd 1:2020)
Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 2: Pipes - Amendment 1 (ISO 15876-2:2017/Amd 1:2020)
Plastics piping systems for hot and cold water installations - Chlorinated poly(vinyl chloride) (PVC-C) - Part 2: Pipes - Amendment 2 (ISO 15877-2:2009/Amd 2:2020)
Plastics piping systems for hot and cold water installations - Chlorinated poly(vinyl chloride) (PVC-C) - Part 5: Fitness for purpose of the system - Amendment 2 (ISO 15877-5:2009/Amd 2:2020)
€48.00
Plastics piping systems for hot and cold water installations - Polyethylene of raised temperature resistance (PE-RT) - Part 2: Pipes - Amendment 1 (ISO 22391-2:2009/Amd 1:2020)
Plastics piping systems for hot and cold water installations - Polyethylene of raised temperature resistance (PE-RT) - Part 3: Fittings - Amendment 1 (ISO 22391-3:2009/Amd 1:2020)
Plastics piping systems for hot and cold water installations - Polyethylene of raised temperature resistance (PE-RT) - Part 5: Fitness for purpose of the system - Amendment 1 (ISO 22391-5:2009/Amd 1:2020, Corrected version 2021-03)
Thermoplastics piping systems for fluids under pressure — Flange adapters and loose backing flanges — Mating dimensions Amendment 1
€21.00
Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 3: Fittings Amendment 2
Glass-reinforced thermosetting plastics (GRP) piping systems based on unsaturated polyester resin (UP) – Jacking and relining pipes - Specifications
€89.00
District cooling pipes. Bonded single pipe systems for directly buried cold water networks Factory made steel valve assembly or plastic service pipe, polyurethane thermal insulation and a casing of polyethylene
€316.00
District cooling pipes. Bonded single pipe systems for directly buried cold water networks Factory made fitting assemblies of steel or plastic service pipe, polyurethane thermal insulation and a casing polyethylene