Application étendue des performances au feu des produits et éléments de construction : principe relatif aux normes EXAP et aux rapports EXAP
€93.67
Extended application of results from fire resistance tests - Non-loadbearing ceilings - Part 7 : Metal sandwich panel construction - Application étendue des résultats des essais de résistance au feu - Murs non porteurs - Partie 7 : Panneaux sandwiches métalliques pour la construction
Extended application of results from fire resistance tests - Non-loadbearing walls - Part 5 : metal sandwich panel construction - Application étendue des résultats des essais de résistance au feu - Murs non porteurs - Partie 5 : Panneaux sandwiches métalliques pour la construction
€82.00
Extended application of test results for fire resistance and/or smoke control for door, shutter and openable window assemblies, including their elements of building hardware - Part 5 : fire resistance of hinged and pivoted metal framed glazed doorsets and openable windows - Application étendue des résultats d'essais en matière de résistance au feu et/ou d'étanchéité à la fumée des blocs-portes, blocs-fermetures et ouvrants de fenêtre, y compris leurs éléments de quincaillerie intégrés - Partie 5 : résistance au feu des blocs-portes vitrés battants et
€207.67
Fire-resistance tests - Part 2 : lift landing door assemblies
€83.85
Fire resistance tests for service installations - Part 11 : fire protective systems for cable systems and associated components
€105.00
Reaction to fire tests for products - Determination of the gross heat of combustion (calorific value)
€107.33
Lifts - Modifications of lift landing doors - Guidelines for keeping the degree of fire resistance - Ascenseurs
Test methods for determining the contribution to the fire resistance of structural members - Part 5 : applied protection to concrete/profiled sheet steel composite member
€93.00
Fire tests - Calibration and use of heat flux meters - Part 4 : guidance on the use of heat flux meters in fire tests - Essais au feu
Test methods for determining the contribution to the fire resistance of structural members - Part 2 : vertical protective membranes
€84.02
Test methods for determining the contribution to the fire resistance of structural members - Part 3 : applied protection to concrete members
€122.08
Fire resistance tests for service installations - Part 8 : smoke extraction ducts
€108.00
Building hardware - Panic exit devices operated by a horizontal bar, for use on escape routes - Requirements and test methods - Quincaillerie pour le bâtiment
€100.63
Building hardware - Emergency exit devices operated by a lever handle or push pad, for use on escape routes - Requirements and test methods - Quincaillerie pour le bâtiment
€128.67