Nombre | apoyo | Revisión | Disponibilidad | Fecha de emisión | Precio | ||
---|---|---|---|---|---|---|---|
PDF sécurisé |
Inglés |
Vigente |
1/1/1996 |
63,00 € |
|
Detalles
Provides guidance on the handling of setpoints for sequenced actions in nuclear and safety-related and nuclear power plant non-safety-related instrumentation. This Technical Report supplements the information provided in ISA-67.04.01-2000, Setpoints for Nuclear Safety-Related Instrumentation, and ISA-RP67.04.02-2000, Methodologies for the Determination of Setpoints for Nuclear Safety-Related Instrumentation, for the performance of instrument uncertainty calculations and instrument setpoint determinations.Scope:This Technical Report provides guidance on the handling of setpoints for sequenced actions in both nuclear safety-related and nuclear power plant non-safety-related instrumentation. Purpose:The purpose of this Technical Report is to supplement the information provided in ISA-67.04.01-2000 and ISA-RP67.04.02-2000, for the performance of instrument uncertainty calculations and instrument setpoint determinations. Specifically, the topics addressed in this Technical Report expand on the discussion of Sections 7 (Establishment of Setpoints) and 9 (Interfaces) of ISA-RP67.04.02-2000.
Información adicional
Autor | International Society of Automation (ISA) |
---|---|
Publicado por | ISA |
Tipo de Documento | Norma |
ICS | 27.120.20 : Plantas de energía nuclear. Seguridad
|
Número de páginas | 34 |
histórico | |
Palabra clave | ISA TR67,ISA-TR67,TR67,ISA-TR67.04.08-1996, ISATR67,TR67,ISATR6704081996,ISATR670408,ISA67,ISATR6704,TR6704,ISA6704,TR670408,ISA670408 |
Formulario de pedido |