ISA-77.20.01:2012

ISA-77.20.01:2012

Fossil fuel power plant simulators - Functional requirements

63,00 €

Détails

The scope of this standard is to address the simulation of fossil fuel power plants typically consisting of:

Boiler, turbine, and balance of plant with steaming capacities of 200,000 lbs/hr (25 kg/s) or greater
Combustion turbine or combined cycle combustion turbine capacity of greater than 100MWs
Associated or interactive processes

This standard will address high-fidelity process and control logic models, highly replicated user interfaces, highly functional instructor tools, high-realism physical fidelity trainee environments, simulator platform considerations, and minimum levels of documentation.

Informations supplémentaires

Auteur International Society of Automation (ISA)
Edité par ISA
Type de document Norme
ICS 25.040.40 : Mesure et contrôle des processus industriels
27.100 : Centrales énergétiques en général
Nombre de pages 42
Remplace ISA-77.20 (1993)
Historique ISA-77.20.01 (2012),ISA-77.20 (1993)
Mot-clé ISA 77,ISA-77,77,ANSI/ISA-77.20.01-2012