IEC 61850-4:2011+AMD1:2020 Edition 2.1

IEC 61850-4:2011+AMD1:2020 Edition 2.1

IEC 61850-4:2011+AMD1:2020 (Consolidated version) Communication networks and systems for power utility automation - Part 4: System and project management

506,00 €

Détails

IEC 61850-4:2011+A1:2020 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. THIS CONSOLIDATED VERSION CONSISTS OF THE SECOND EDITION (2011) AND ITS AMENDMENT 1 (2020). THEREFORE, NO NEED TO ORDER AMENDMENT IN ADDITION TO THIS PUBLICATION.

This publication is of core relevance for Smart Grid.

Informations supplémentaires

Auteur International Electrotechnical Commission (IEC)
Comité TC 57
Edité par IEC
Type de document Norme
Edition révision n° 2
ICS 33.200 : Télécommande. télémesure
Nombre de pages 47
Mot-clé IEC61850-4,IEC 61850-4:2011+AMD1:2020 CSV,IEC 61850-4,TC 57