ASME BPVC.XI.2-2023

ASME BPVC.XI.2-2023

Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities

779,00 €
Me prévenir en cas d'actualité sur ce produit

Détails

Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 2 This Division provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.

Informations supplémentaires

Auteur American Society of Mechanical Engineers (ASME)
Edité par ASME
Type de document Norme
Thème Nuclear
Edition révision n° 2023
EAN ISBN 9780791875889
ICS 27.060.30 : Chaudières et échangeurs de chaleur
Nombre de pages 151
Remplace ASME BPVC.XI.2-2021
Poids (kg.) 0.36
Mot-clé BPVC.XI.2-2023
Bon de commande