SCTE 25-1 2017 (R2022)

SCTE 25-1 2017 (R2022)

Hybrid Fiber Coax Outside Plant Status Monitoring - Physical (PHY) Layer Specification v1.

€27.00

Details

This specification describes the PHY layer requirements that must be implemented by all Type 2 and Type 3 compliant OSP HMS transponders on the HFC plant and the controlling equipment in the headend. Any exceptions to compliance with this specification will be specifically noted in this document as necessary. Refer to Table 1 for a full definition of the Type Classifications.

Additional Info

Author Society of Cable Telecommunication Engineers
Published by SCTE
Document type Standard
Confirmation date 2022-01-01
Number of pages 27
Replace SCTE 25-1 2017,SCTE 25-1 2008,SCTE 25-1 2002
Keyword SCTE 25-1 2017 (R2022)