ISA-77.20.01:2012

ISA-77.20.01:2012

Fossil fuel power plant simulators - Functional requirements

€63.00

Details

The scope of this standard is to address the simulation of fossil fuel power plants typically consisting of:

Boiler, turbine, and balance of plant with steaming capacities of 200,000 lbs/hr (25 kg/s) or greater
Combustion turbine or combined cycle combustion turbine capacity of greater than 100MWs
Associated or interactive processes

This standard will address high-fidelity process and control logic models, highly replicated user interfaces, highly functional instructor tools, high-realism physical fidelity trainee environments, simulator platform considerations, and minimum levels of documentation.

Additional Info

Author International Society of Automation (ISA)
Published by ISA
Document type Standard
ICS 25.040.40 : Industrial process measurement and control
27.100 : Power stations in general
Number of pages 42
Replace ISA-77.20 (1993)
Document history ISA-77.20.01 (2012),ISA-77.20 (1993)
Keyword ISA 77,ISA-77,77,ANSI/ISA-77.20.01-2012