Name | Support | Language | Availability | Edition date | Price | ||
---|---|---|---|---|---|---|---|
PDF |
English |
Active |
10/30/2020 |
€56.00 |
|
||
PDF |
English |
Active |
10/30/2020 |
€80.00 |
|
||
Paper |
English |
Active |
10/30/2020 |
€100.00 |
|
Details
Revision Standard - Active.
Considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, or maintenance are provided in this recommended practice. This recommended practice does not apply to periodic surveillance testing. For purposes of this recommended practice, in addition to a nuclear power plant, a nuclear facility is defined as a facility related to the nuclear fuel cycle from fuel processing to reprocessing and waste management.
This recommended practice provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, and maintenance. This recommended practice does not apply to periodic surveillance testing.
The purpose of this recommended practice is to identify the activities, instructions, and attributes that should be considered in the process of installing, inspecting, and testing during new construction, modification, and maintenance for Class 1E power, instrumentation, and control equipment at nuclear facilities.
Additional Info
Author | Institute of Electrical and Electronics Engineers (IEEE) |
---|---|
Committee | Nuclear Power Engineering |
Published by | IEEE |
Document type | Standard |
Edition | |
EAN ISBN | 978-1-5044-7162-6 |
ICS | 27.120.20 : Nuclear power plants. Safety
|
Number of pages | 25 |
Replace | IEEE 336:2010 |
Keyword | IEEE 336-2020 |
Order form |