Closure for annual leave, no order will be honored August 1 to August 19, 2019 included.

Call +33 (1) 40 02 03 05
Type de carte de crédit

93.060 : Tunnel construction

151 Item(s)

Set Ascending Direction
per page

List  Grid 

  • 19/30340390 DC


    2/25/2019 - PDF - English - BSI
    Learn More
    €41.40

  • DIN EN 14067-5:2018-10

    Railway applications - Aerodynamics - Part 5: Requirements and test procedures for aerodynamics in tunnels; German and English version prEN 14067-5:2018
    10/1/2018 - PDF - English, German - DIN
    Learn More
    €209.50

  • 18/30295401 DC


    9/26/2018 - PDF - English - BSI
    Learn More
    €23.00

  • NF EN 13491, G38-172 (03/2018)

    Geosynthetic barriers - Characteristics required for use in the construction of tunnels and associated underground structures - Géomembranes et géosynthétiques bentonitiques - Caractéristiques requises pour l'utilisation comme barrière aux fluides dans la construction des tunnels et des structures souterraines associées
    3/1/2018 - Paper - French - AFNOR
    Learn More
    €127.55

  • ASTM E3134-17

    Standard Specification for Transportation Tunnel Structural Components and Passive Fire Protection Systems
    12/15/2017 - PDF - English - ASTM
    Learn More
    €49.00

  • NFPA 502:2017

    Standard for Road Tunnels, Bridges, and Other Limited Access Highways
    1/1/2017 - Paper - English - NFPA
    Learn More
    €54.00

  • NF ISO 10815, E90-016 (12/2016)

    Mechanical vibration - Measurement of vibration generated internally in railway tunnels by the passage of trains - Vibrations mécaniques - Mesurage des vibrations produites à l'intérieur des tunnels ferroviaires par le passage des trains
    12/1/2016 - Paper - French - AFNOR
    Learn More
    €76.40

  • NF EN 13256, G38-188 (12/2016)

    Geotextiles and geotextile-related products - Characteristics required for use in the construction of tunnels and underground structures - Géotextiles et produits apparentés - Caractéristiques requises pour l'utilisation dans la construction de tunnels et de structures souterraines
    12/1/2016 - Paper - French - AFNOR
    Learn More
    €95.37

  • BS ISO 10815:2016

    Mechanical vibration. Measurement of vibration generated internally in railway tunnels by the passage of trains
    9/30/2016 - PDF - English - BSI
    Learn More
    €202.40

  • ISO 10815:2016

    Mechanical vibration -- Measurement of vibration generated internally in railway tunnels by the passage of trains
    9/1/2016 - Paper - English - ISO
    Learn More
    €123.00

  • ISO 10815:2016

    Mechanical vibration -- Measurement of vibration generated internally in railway tunnels by the passage of trains
    9/1/2016 - Paper - French - ISO
    Learn More
    €123.00

  • PAS 8810:2016

    Tunnel design. Design of concrete segmental tunnel linings. Code of practice
    4/30/2016 - PDF - English - BSI
    Learn More
    €138.00

  • DIN EN 12111:2015-10

    Tunnelling machines - Road headers and continuous miners - Safety requirements; German version EN 12111:2014
    10/1/2015 - PDF - German - DIN
    Learn More
    €130.80

  • DIN EN 12111:2015-10

    Tunnelling machines - Road headers and continuous miners - Safety requirements; German version EN 12111:2014
    10/1/2015 - PDF - English - DIN
    Learn More
    €163.50

  • UNE-EN 16191:2015

    Tunnelling machinery - Safety requirements
    4/29/2015 - PDF - Spanish - AENOR
    Learn More
    €75.00

  • UNE-EN 12110:2014

    Tunnelling machines - Air locks - Safety requirements
    11/5/2014 - PDF - Spanish - AENOR
    Learn More
    €58.00

  • UNE-EN 12111:2014

    Tunnelling machines - Road headers and continuous miners - Safety requirements
    11/5/2014 - PDF - Spanish - AENOR
    Learn More
    €70.00

  • DIN EN 12110:2014-10

    Tunnelling machines - Air locks - Safety requirements; German version EN 12110:2014
    10/1/2014 - PDF - German - DIN
    Learn More
    €96.00

  • DIN EN 12110:2014-10

    Tunnelling machines - Air locks - Safety requirements; German version EN 12110:2014
    10/1/2014 - PDF - English - DIN
    Learn More
    €120.20

  • ASTM F3079-14

    Standard Practice for Use of Distributed Optical Fiber Sensing Systems for Monitoring the Impact of Ground Movements During Tunnel and Utility Construction on Existing Underground Utilities
    10/1/2014 - PDF - English - ASTM
    Learn More
    €49.00

  • DIN EN 16191:2014-09

    Tunnelling machinery - Safety requirements; German version EN 16191:2014
    9/1/2014 - PDF - German - DIN
    Learn More
    €130.80

  • DIN EN 16191:2014-09

    Tunnelling machinery - Safety requirements; German version EN 16191:2014
    9/1/2014 - PDF - English - DIN
    Learn More
    €163.50

  • NF EN 16191, E58-301 (08/2014)

    Tunnelling machinery - Safety requirements - Machines pour la construction de tunnels
    8/1/2014 - Paper - French - AFNOR
    Learn More
    €104.89

  • NBN EN 16191:2014

    Tunnelling machinery - Safety requirements
    7/25/2014 - PDF - German - NBN
    Learn More
    €105.00

  • NBN EN 16191:2014

    Tunnelling machinery - Safety requirements
    7/25/2014 - PDF - English - NBN
    Learn More
    €105.00

  • NBN EN 16191:2014

    Tunnelling machinery - Safety requirements
    7/25/2014 - PDF - French - NBN
    Learn More
    €105.00

  • NBN EN 12110:2014

    Tunnelling machines - Air locks - Safety requirements
    7/25/2014 - PDF - German - NBN
    Learn More
    €77.00

  • NBN EN 12110:2014

    Tunnelling machines - Air locks - Safety requirements
    7/25/2014 - PDF - English - NBN
    Learn More
    €77.00

  • NBN EN 12110:2014

    Tunnelling machines - Air locks - Safety requirements
    7/25/2014 - PDF - French - NBN
    Learn More
    €77.00

  • NF EN 12111, E58-302 (07/2014)

    Tunnelling machines - Road headers and continuous miners - Safety requirements - Machines pour la construction de tunnels
    7/1/2014 - Paper - French - AFNOR
    Learn More
    €95.37

  • NF EN 12110, E58-304 (07/2014)

    Tunnelling machines - Air locks - Safety requirements - Machines pour la construction de tunnels
    7/1/2014 - Paper - French - AFNOR
    Learn More
    €76.40

  • NBN EN 12111:2014

    Tunnelling machines - Road headers and continuous miners - Safety requirements
    6/20/2014 - PDF - German - NBN
    Learn More
    €105.00

  • NBN EN 12111:2014

    Tunnelling machines - Road headers and continuous miners - Safety requirements
    6/20/2014 - PDF - English - NBN
    Learn More
    €105.00

  • NBN EN 12111:2014

    Tunnelling machines - Road headers and continuous miners - Safety requirements
    6/20/2014 - PDF - French - NBN
    Learn More
    €105.00

  • BS EN 12111:2014

    Tunnelling machines. Road headers and continuous miners. Safety requirements
    5/31/2014 - PDF - English - BSI
    Learn More
    €266.80

  • BS EN 16191:2014

    Tunnelling machinery. Safety requirements
    5/31/2014 - PDF - English - BSI
    Learn More
    €282.90

  • BS EN 12110:2014

    Tunnelling machines. Air locks. Safety requirements
    5/31/2014 - PDF - English - BSI
    Learn More
    €202.40

  • UNE-EN 13491:2013

    Geosynthetic barriers - Characteristics required for use as a fluid barrier in the construction of tunnels and associated underground structures
    12/18/2013 - PDF - Spanish - AENOR
    Learn More
    €63.00

  • NF EN 13491, G38-172 (11/2013)

    Geosynthetic Barriers - Characteristics required for use as a fluid barrier in the construction of tunnels and associated underground structures - Barrières géosynthétiques
    11/1/2013 - Paper - French - AFNOR
    Learn More
    €87.56

  • UNE-EN 14067-5:2007+A1:2011

    Railway applications - Aerodynamics - Part 5: Requirements and test procedures for aerodynamics in tunnels
    9/28/2011 - PDF - English - AENOR
    Learn More
    €74.40

  • UNE-EN 14067-5:2007+A1:2011

    Railway applications - Aerodynamics - Part 5: Requirements and test procedures for aerodynamics in tunnels
    9/28/2011 - PDF - Spanish - AENOR
    Learn More
    €62.00

  • BS 6164:2011 (R2016)

    Code of practice for health and safety in tunnelling in the construction industry
    7/31/2011 - PDF - English - BSI
    Learn More
    €379.50

  • DIN EN 14067-5:2011-01

    Railway applications - Aerodynamics - Part 5: Requirements and test procedures for aerodynamics in tunnels; German version EN 14067-5:2006+A1:2010
    1/1/2011 - PDF - German - DIN
    Learn More
    €103.00

  • DIN EN 14067-5:2011-01

    Railway applications - Aerodynamics - Part 5: Requirements and test procedures for aerodynamics in tunnels; German version EN 14067-5:2006+A1:2010
    1/1/2011 - PDF - English - DIN
    Learn More
    €128.80

  • NBN EN 14067-5+A1:2010

    Railway applications - Aerodynamics - Part 5: Requirements and test procedures for aerodynamics in tunnels
    12/17/2010 - PDF - English - NBN
    Learn More
    €77.00

  • NBN EN 14067-5+A1:2010

    Railway applications - Aerodynamics - Part 5: Requirements and test procedures for aerodynamics in tunnels
    12/17/2010 - PDF - French - NBN
    Learn More
    €77.00

  • ASSE A 10.16:2009 (R2016)

    Safety Requirements for Tunnels, Shafts, and Caissons
    1/1/2009 - PDF sécurisé - English - ASSE
    Learn More
    €110.00

  • UIC 779-10:2008-08

    Management and maintenance principles for existing tunnels
    8/1/2008 - PDF - German - UIC
    Learn More
    €444.40

  • UIC 779-10:2008-08

    Management and maintenance principles for existing tunnels
    8/1/2008 - PDF - English - UIC
    Learn More
    €444.40

  • UIC 779-10:2008-08

    Management and maintenance principles for existing tunnels
    8/1/2008 - PDF - French - UIC
    Learn More
    €444.40

  • NF ISO 14837-1, E90-011-1 (04/2006)

    Mechanical vibration - Ground-borne noise and vibration arising from rail systems - Part 1 : general guidance - Vibrations mécaniques
    4/1/2006 - Paper - French - AFNOR
    Learn More
    €104.89

  • BS ISO 14837-1:2005 (R2014)

    Mechanical vibration. Ground-borne noise and vibration arising from rail systems. General guidance
    10/3/2005 - PDF - English - BSI
    Learn More
    €282.90

  • VdS 3502:2005-08

    Leaflet on Fire Protection in Road Tunnels
    8/1/2005 - PDF - German - VDS
    Learn More
    €7.81

  • VdS 3502:2005-08

    Leaflet on Fire Protection in Road Tunnels
    8/1/2005 - PDF - English - VDS
    Learn More
    €10.06

  • UIC 779-11:2005-02

    Determination of railway tunnel cross-sectional areas on the basis of aerodynamic considerations
    2/1/2005 - PDF - German - UIC
    Learn More
    €642.40

  • UIC 779-11:2005-02

    Determination of railway tunnel cross-sectional areas on the basis of aerodynamic considerations
    2/1/2005 - PDF - English - UIC
    Learn More
    €642.40

  • UIC 779-11:2005-02

    Determination of railway tunnel cross-sectional areas on the basis of aerodynamic considerations
    2/1/2005 - PDF - French - UIC
    Learn More
    €642.40

  • UIC 779-9:2003-08

    Safety in railway tunnels
    8/1/2003 - PDF - German - UIC
    Learn More
    €508.20

  • UIC 779-9:2003-08

    Safety in railway tunnels
    8/1/2003 - PDF - English - UIC
    Learn More
    €508.20

  • UIC 779-9:2003-08

    Safety in railway tunnels
    8/1/2003 - PDF - French - UIC
    Learn More
    €508.20

  • UIC C 218 DT 367:1999-12

    PRESSURE VARIATIONS IN TUNNELS - Tunnel Pressure Alleviation Systems Bibliography
    12/1/1999 - PDF - English - UIC
    Learn More
    €330.00

  • UIC C 218 RP 6:1999-09

    PRESSURE VARIATIONS IN TUNNELS - Trends and benefits based on train borne pressure changes of incorporating airshafts into railway tunnels.
    9/1/1999 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 218 RP 6:1999-09

    PRESSURE VARIATIONS IN TUNNELS - Trends and benefits based on train borne pressure changes of incorporating airshafts into railway tunnels.
    9/1/1999 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 218 RP 6:1999-09

    PRESSURE VARIATIONS IN TUNNELS - Trends and benefits based on train borne pressure changes of incorporating airshafts into railway tunnels.
    9/1/1999 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 218 RP 1:1999-03

    PRESSURE VARIATIONS IN TUNNELS - Baseline Comfort Criteria A 'Baseline' pressure comfort criterion for unsealed and sealed train operation in tunnels
    3/1/1999 - PDF - German - UIC
    Learn More
    €440.00

  • UIC C 218 RP 1:1999-03

    PRESSURE VARIATIONS IN TUNNELS - Baseline Comfort Criteria A 'Baseline' pressure comfort criterion for unsealed and sealed train operation in tunnels
    3/1/1999 - PDF - English - UIC
    Learn More
    €440.00

  • UIC C 218 RP 1:1999-03

    PRESSURE VARIATIONS IN TUNNELS - Baseline Comfort Criteria A 'Baseline' pressure comfort criterion for unsealed and sealed train operation in tunnels
    3/1/1999 - PDF - French - UIC
    Learn More
    €440.00

  • UIC C 218 RP 2:1998-11

    PRESSURE VARIATIONS IN TUNNELS - Draft UIC leaflet for sealed train operations. Determination of Railway Tunnel Crosssectional Areas for Sealed Trains on the Basis of Aerodynamics Considerations
    11/1/1998 - PDF - German - UIC
    Learn More
    €330.00

  • UIC C 218 RP 2:1998-11

    PRESSURE VARIATIONS IN TUNNELS - Draft UIC leaflet for sealed train operations. Determination of Railway Tunnel Crosssectional Areas for Sealed Trains on the Basis of Aerodynamics Considerations
    11/1/1998 - PDF - English - UIC
    Learn More
    €330.00

  • UIC C 218 RP 2:1998-11

    PRESSURE VARIATIONS IN TUNNELS - Draft UIC leaflet for sealed train operations. Determination of Railway Tunnel Crosssectional Areas for Sealed Trains on the Basis of Aerodynamics Considerations
    11/1/1998 - PDF - French - UIC
    Learn More
    €330.00

  • UIC C 218 RP 4:1998-11

    PRESSURE VARIATIONS IN TUNNELS - Technical review of tunnel pressure alleviation devices
    11/1/1998 - PDF - German - UIC
    Learn More
    €440.00

  • UIC C 218 RP 4:1998-11

    PRESSURE VARIATIONS IN TUNNELS - Technical review of tunnel pressure alleviation devices
    11/1/1998 - PDF - English - UIC
    Learn More
    €440.00

  • UIC C 218 RP 4:1998-11

    PRESSURE VARIATIONS IN TUNNELS - Technical review of tunnel pressure alleviation devices
    11/1/1998 - PDF - French - UIC
    Learn More
    €440.00

  • DIN 21521-2:1993-02

    Rock bolts for mining and tunnel support; general specifications for steel-bolts; tests, testing methods
    2/1/1993 - PDF - German - DIN
    Learn More
    €47.60

  • DIN 21521-1:1990-07

    Rock bolts for mining and tunnelling; terms
    7/1/1990 - PDF - German - DIN
    Learn More
    €40.80

  • JIS Z 9116:1990 (R2011)

    Lighting of tunnels for motorrized traffic
    4/1/1990 - PDF - Japanese - JSA
    Learn More
    €25.00

  • UIC C 167 RP 9:1987-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - An investigation into the thermal effects produced by the transit of a single train through a tunnel (Patchway Tunnel)
    4/1/1987 - PDF - German - UIC
    Learn More
    €330.00

  • UIC C 167 RP 9:1987-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - An investigation into the thermal effects produced by the transit of a single train through a tunnel (Patchway Tunnel)
    4/1/1987 - PDF - English - UIC
    Learn More
    €330.00

  • UIC C 167 RP 9:1987-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - An investigation into the thermal effects produced by the transit of a single train through a tunnel (Patchway Tunnel)
    4/1/1987 - PDF - French - UIC
    Learn More
    €330.00

  • UIC C 167 RP 11:1987-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Pressure transients produced by two trains passing at speeds close to 200 km/h in a tunnel with airshafts (Chipping Sodbury Tunnel)
    4/1/1987 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 167 RP 11:1987-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Pressure transients produced by two trains passing at speeds close to 200 km/h in a tunnel with airshafts (Chipping Sodbury Tunnel)
    4/1/1987 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 167 RP 11:1987-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Pressure transients produced by two trains passing at speeds close to 200 km/h in a tunnel with airshafts (Chipping Sodbury Tunnel)
    4/1/1987 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 167 RP 12:1987-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Synthesis of the results obtained in the aerodynamic acoustic and thermal fields (Final Report)
    4/1/1987 - PDF - German - UIC
    Learn More
    €660.00

  • UIC C 167 RP 12:1987-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Synthesis of the results obtained in the aerodynamic acoustic and thermal fields (Final Report)
    4/1/1987 - PDF - English - UIC
    Learn More
    €660.00

  • UIC C 167 RP 12:1987-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Synthesis of the results obtained in the aerodynamic acoustic and thermal fields (Final Report)
    4/1/1987 - PDF - French - UIC
    Learn More
    €660.00

  • UIC C 167 DT 188:1986-12

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Report on a study trip to Japan organised by ORE on the subject of problems caused by trains running at high speed in tunnels, by Messrs. Gawthorpe, Glöckle, Hölzl
    12/1/1986 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 167 DT 188:1986-12

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Report on a study trip to Japan organised by ORE on the subject of problems caused by trains running at high speed in tunnels, by Messrs. Gawthorpe, Glöckle, Hölzl
    12/1/1986 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 167 DT 188:1986-12

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Report on a study trip to Japan organised by ORE on the subject of problems caused by trains running at high speed in tunnels, by Messrs. Gawthorpe, Glöckle, Hölzl
    12/1/1986 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 167 RP 8:1986-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Test rig study on the penetration of noise into railway vehicles
    9/1/1986 - PDF - German - UIC
    Learn More
    €330.00

  • UIC C 167 RP 8:1986-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Test rig study on the penetration of noise into railway vehicles
    9/1/1986 - PDF - English - UIC
    Learn More
    €330.00

  • UIC C 167 RP 8:1986-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Test rig study on the penetration of noise into railway vehicles
    9/1/1986 - PDF - French - UIC
    Learn More
    €330.00

  • UIC C 167 RP 10:1986-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena occurring when trains pass through tunnels Schlüchtern tunnel: pressure changes with open and closed ventilation shaft
    9/1/1986 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 167 RP 10:1986-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena occurring when trains pass through tunnels Schlüchtern tunnel: pressure changes with open and closed ventilation shaft
    9/1/1986 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 167 RP 10:1986-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena occurring when trains pass through tunnels Schlüchtern tunnel: pressure changes with open and closed ventilation shaft
    9/1/1986 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 167 RP 3:1986-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena occurring when trains pass through tunnels. Slipstream measurements: Tests on dummies in the Costa dei Rosi tunnel. Trackside measurements of air velocity and pressure
    4/1/1986 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 167 RP 3:1986-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena occurring when trains pass through tunnels. Slipstream measurements: Tests on dummies in the Costa dei Rosi tunnel. Trackside measurements of air velocity and pressure
    4/1/1986 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 167 RP 3:1986-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena occurring when trains pass through tunnels. Slipstream measurements: Tests on dummies in the Costa dei Rosi tunnel. Trackside measurements of air velocity and pressure
    4/1/1986 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 167 RP 4:1986-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena of trains passing through tunnels: Transient pressures produced by two passenger trains passing and running singly in Costa dei Rosi tunnel
    4/1/1986 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 167 RP 4:1986-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena of trains passing through tunnels: Transient pressures produced by two passenger trains passing and running singly in Costa dei Rosi tunnel
    4/1/1986 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 167 RP 4:1986-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena of trains passing through tunnels: Transient pressures produced by two passenger trains passing and running singly in Costa dei Rosi tunnel
    4/1/1986 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 167 RP 5:1986-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Pressure changes and forces on wagons and their loads when trains pass in tunnels; tests carried out on the FS 'Direttissima' line in Oct. 1984
    4/1/1986 - PDF - German - UIC
    Learn More
    €440.00

  • UIC C 167 RP 5:1986-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Pressure changes and forces on wagons and their loads when trains pass in tunnels; tests carried out on the FS 'Direttissima' line in Oct. 1984
    4/1/1986 - PDF - English - UIC
    Learn More
    €440.00

  • UIC C 167 RP 5:1986-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Pressure changes and forces on wagons and their loads when trains pass in tunnels; tests carried out on the FS 'Direttissima' line in Oct. 1984
    4/1/1986 - PDF - French - UIC
    Learn More
    €440.00

  • UIC C 149 RP 13:1985-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Final report
    9/1/1985 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 149 RP 13:1985-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Final report
    9/1/1985 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 149 RP 13:1985-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Final report
    9/1/1985 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 167 RP 2:1985-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena of trains passing through tunnels: Resistance to forward movement. Tests in the tunnels Costa dei Rosi, Castiglione and Pizzi di Foglia
    9/1/1985 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 167 RP 2:1985-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena of trains passing through tunnels: Resistance to forward movement. Tests in the tunnels Costa dei Rosi, Castiglione and Pizzi di Foglia
    9/1/1985 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 167 RP 2:1985-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena of trains passing through tunnels: Resistance to forward movement. Tests in the tunnels Costa dei Rosi, Castiglione and Pizzi di Foglia
    9/1/1985 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 167 RP 6:1985-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena occurring when trains pass through tunnels: Tests carried out on the Direttissima line in the Costa dei Rosi, Castiglione and Pizzi di Foglia tunnels
    9/1/1985 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 167 RP 6:1985-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena occurring when trains pass through tunnels: Tests carried out on the Direttissima line in the Costa dei Rosi, Castiglione and Pizzi di Foglia tunnels
    9/1/1985 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 167 RP 6:1985-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Aerodynamic phenomena occurring when trains pass through tunnels: Tests carried out on the Direttissima line in the Costa dei Rosi, Castiglione and Pizzi di Foglia tunnels
    9/1/1985 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 167 RP 7:1985-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Acoustic measurements on the inside and outside of coaches and at the tunnel mouth
    9/1/1985 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 167 RP 7:1985-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Acoustic measurements on the inside and outside of coaches and at the tunnel mouth
    9/1/1985 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 167 RP 7:1985-09

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Acoustic measurements on the inside and outside of coaches and at the tunnel mouth
    9/1/1985 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 167 RP 1:1985-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Thermal phenomena of trains passing through tunnels: Tests in the Costa dei Rosi tunnel
    4/1/1985 - PDF - German - UIC
    Learn More
    €330.00

  • UIC C 167 RP 1:1985-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Thermal phenomena of trains passing through tunnels: Tests in the Costa dei Rosi tunnel
    4/1/1985 - PDF - English - UIC
    Learn More
    €330.00

  • UIC C 167 RP 1:1985-04

    TRAINS RUNNING AT HIGH SPEED IN TUNNELS - Thermal phenomena of trains passing through tunnels: Tests in the Costa dei Rosi tunnel
    4/1/1985 - PDF - French - UIC
    Learn More
    €330.00

  • UIC C 149 RP 11:1984-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - The effect of an airshaft on the pressure transients generated by a single train in a double track tunnel
    9/1/1984 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 149 RP 11:1984-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - The effect of an airshaft on the pressure transients generated by a single train in a double track tunnel
    9/1/1984 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 149 RP 11:1984-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - The effect of an airshaft on the pressure transients generated by a single train in a double track tunnel
    9/1/1984 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 149 RP 12:1984-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements in the DES BACHEES tunnel
    9/1/1984 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 149 RP 12:1984-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements in the DES BACHEES tunnel
    9/1/1984 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 149 RP 12:1984-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements in the DES BACHEES tunnel
    9/1/1984 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 149 RP 9:1984-04

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - The slipstream and wake flows generated by a single train in a double track tunnel (BR Stanton Tunnel)
    4/1/1984 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 149 RP 9:1984-04

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - The slipstream and wake flows generated by a single train in a double track tunnel (BR Stanton Tunnel)
    4/1/1984 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 149 RP 9:1984-04

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - The slipstream and wake flows generated by a single train in a double track tunnel (BR Stanton Tunnel)
    4/1/1984 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 149 RP 7:1983-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements taken in RillylaMontagne Tunnel
    9/1/1983 - PDF - German - UIC
    Learn More
    €440.00

  • UIC C 149 RP 7:1983-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements taken in RillylaMontagne Tunnel
    9/1/1983 - PDF - English - UIC
    Learn More
    €440.00

  • UIC C 149 RP 7:1983-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements taken in RillylaMontagne Tunnel
    9/1/1983 - PDF - French - UIC
    Learn More
    €440.00

  • UIC C 149 RP 8:1983-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Tests to determine the effect of air shafts on the pressure changes in a single track tunnel (Überlingen tunnel)
    9/1/1983 - PDF - German - UIC
    Learn More
    €440.00

  • UIC C 149 RP 8:1983-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Tests to determine the effect of air shafts on the pressure changes in a single track tunnel (Überlingen tunnel)
    9/1/1983 - PDF - English - UIC
    Learn More
    €440.00

  • UIC C 149 RP 8:1983-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Tests to determine the effect of air shafts on the pressure changes in a single track tunnel (Überlingen tunnel)
    9/1/1983 - PDF - French - UIC
    Learn More
    €440.00

  • UIC C 149 RP 6:1983-04

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Parametric study of pressure changes in tunnels (Part 2: Trains passing in tunnels)
    4/1/1983 - PDF - German - UIC
    Learn More
    €330.00

  • UIC C 149 RP 6:1983-04

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Parametric study of pressure changes in tunnels (Part 2: Trains passing in tunnels)
    4/1/1983 - PDF - English - UIC
    Learn More
    €330.00

  • UIC C 149 RP 6:1983-04

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Parametric study of pressure changes in tunnels (Part 2: Trains passing in tunnels)
    4/1/1983 - PDF - French - UIC
    Learn More
    €330.00

  • UIC C 149 RP 5:1982-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Measurements of the slipstream produced by a passing train (tests in Monte Perazzo tunnel)
    9/1/1982 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 149 RP 5:1982-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Measurements of the slipstream produced by a passing train (tests in Monte Perazzo tunnel)
    9/1/1982 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 149 RP 5:1982-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Measurements of the slipstream produced by a passing train (tests in Monte Perazzo tunnel)
    9/1/1982 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 149 RP 4:1982-04

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Parametric study of pressure changes in tunnels Part I: Single trains in simple tunnels
    4/1/1982 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 149 RP 4:1982-04

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Parametric study of pressure changes in tunnels Part I: Single trains in simple tunnels
    4/1/1982 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 149 RP 4:1982-04

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Parametric study of pressure changes in tunnels Part I: Single trains in simple tunnels
    4/1/1982 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 149 RP 2:1981-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements in the Heitersbergtunnel
    9/1/1981 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 149 RP 2:1981-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements in the Heitersbergtunnel
    9/1/1981 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 149 RP 2:1981-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements in the Heitersbergtunnel
    9/1/1981 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 149 RP 3:1981-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements taken in a number of tunnels on the new high speed line between Rome and Florence
    9/1/1981 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 149 RP 3:1981-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements taken in a number of tunnels on the new high speed line between Rome and Florence
    9/1/1981 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 149 RP 3:1981-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Aerodynamic measurements taken in a number of tunnels on the new high speed line between Rome and Florence
    9/1/1981 - PDF - French - UIC
    Learn More
    €220.00

  • UIC C 149 RP 1:1980-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Theoretical prediction methods for calculating unsteady flows in railway tunnels
    9/1/1980 - PDF - German - UIC
    Learn More
    €220.00

  • UIC C 149 RP 1:1980-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Theoretical prediction methods for calculating unsteady flows in railway tunnels
    9/1/1980 - PDF - English - UIC
    Learn More
    €220.00

  • UIC C 149 RP 1:1980-09

    PROBLEMS ARISING FROM THE RUNNING OF HIGH SPEED TRAINS IN TUNNELS - Theoretical prediction methods for calculating unsteady flows in railway tunnels
    9/1/1980 - PDF - French - UIC
    Learn More
    €220.00

151 Item(s)

Set Ascending Direction
per page

List  Grid